Sree Vinayaga Automation Solutions
Sree Vinayaga Automation Solutions
Send Email
0804605147877% Response Rate
Search

Home » Our Products » Solid Waste Management Plant Machines


Solid Waste Management Plant Machines

Sree Vinayaga Automation Solutionsis engaged in designing, manufacturing and supplying complete range of equipments, process and automation solution for solid waste management and have facility to design complete plant and machineries of handling municipal solid waste 10 tpd to 500 tpd.By our solid waste management plant bio degradable materials segregated and converts it's as organic manure. Further screened balance combustible plastic waste alternatively processed to produce a high calorific fuel termed as refused derived fuel


Some of Process Machines Are:

  • Trommel used to segregate materials of size

  • Belt chain drive conveyor for transfer the solid waste to process

  • Shredders for shredding bulk materials, plastic ,rags etc to reduce size for further process

  • Air density separator for separating stones and heavier materials from manure


Wind Row Composting Plant

REQUEST CALLBACK

Wind Row Composting Plant
  • Wind Row Composting Plant
  • Wind Row Composting Plant
  • Wind Row Composting Plant
  • Wind Row Composting Plant
Get Best Quote

Thanks for Contacting Us.

Approx. Rs 35 Lakh / 1 unitGet Latest Price

Product Brochure
Product Details:
Minimum Order Quantity1 1 unit
Usage/ApplicationOrganic Waste Composting
BrandSREEvas
Capacity40 - 50TPD
Quality Of CompostHigh Quality
GradeFully-Automatic
MaterialMild Stee;
Country of OriginMade in India

windrow composting is the production of compost by piling organic matter or biodegradable waste, such as animal manure and crop residues, in long rows (windrows). This method is suited to producing large volumes of compost. These rows are generally turned to improve porosity and oxygen content, mix in or remove moisture, and redistribute cooler and hotter portions of the pile. Windrow composting is a commonly used farm scale composting method.

Additional Information:

  • Delivery Time: 3 Months
  • Packaging Details: Standard
  • Yes! I am interested

    Municipal Solid Waste Management Plant

    REQUEST CALLBACK

    Municipal Solid Waste Management Plant
    • Municipal Solid Waste Management Plant
    • Municipal Solid Waste Management Plant
    • Municipal Solid Waste Management Plant
    • Municipal Solid Waste Management Plant
    Get Best Quote

    Thanks for Contacting Us.

    Approx. Rs 100 Lakh / SetGet Latest Price

    Product Brochure
    Product Details:
    Minimum Order Quantity1 Set
    Type Of ServicesManufacturer and Supplier
    Service LocationIndustrial
    Type Of WasteBiodegradable
    FrequencyOne Time
    CapacityCustomised
    Material GradeMS

    Sree Vinayaga Automation Solutions  is engaged in designing,  manufacturing and supplying  complete range of equipments, process and automation solution for solid waste management and have facility to design complete plant and machineries of handling municipal solid waste 10 tpd to 500 tpd.By our solid waste management plant bio degradable materials segregated and converts it's as organic manure. Further screened balance combustible plastic waste alternatively processed to produce a high calorific fuel termed as refused derived fuel

    Additional Information:

  • Production Capacity: 10 TPH TO 100TPH
  • Delivery Time: 4 Months
  • Packaging Details: Standard
  • Yes! I am interested

     
    X


    Explore More Products

    Contact via E-mail
    Contact via SMS
    Ram Manikandan (Managing Director)
    Sree Vinayaga Automation Solutions
    12, Sri Ganesh Nagar, Pollachi Main Road, Eachanari
    Coimbatore - 641021, Tamil Nadu, India
    Call Us: 
    Call Response Rate: 77%
    Share Us :



    Home  |   About Us   |  Our Products  |  Site Map  |   Contact Us

    © Sree Vinayaga Automation Solutions. All Rights Reserved (Terms of Use)
    Developed and Managed by IndiaMART InterMESH Limited

    Sree Vinayaga Automation Solutions